Test Repository
  • 20 Mar 2024
  • 1 Minute to read
  • PDF

Test Repository

  • PDF

Article summary

Overview

The Test Repository page provides access to all tests and access to various actions described below.

Each Project has its own Test repository. Tests in the test repository are organized in an easy-to-use folder structure that allows teams to organize their tests in whatever structure best fits their needs.

Displayed Information

Action Buttons



NewClick on the dropdown to create a new standard test or new template test.
New FolderCreates a new folder in the current view. There is no hierarchical limit. As many folders and sub-folders can be created as desired.
OpenOpen the Test Configuration page for an existing test.
RunRun a test. See information about the Run Test page.
View HistoryNavigate to a page displaying the historical pass/fail results for a selected test. See information about the View Test History page.
RenameRename a selected test or folder.
Move/CopyMove or copy one or more selected tests or folders to another folder.
DeleteDelete one or more selected tests or folders.

What's in the Table?

Column NameDescription
NameThe name of the test or test folder.
Template Test NameThe parent template the child test was created from. Click the template test name to edit the template.
Last ModifiedLast modified date.
Last Edited ByThe user who made the last edit.
Result Trend (past 2 weeks)The result trend column shows a graphical representation of how many tests related to a table or a column has passed, failed, or executed with an error in the past two weeks. No bar chart means that no test has been executed and saved to the repository in the past two weeks.

Using Move/Copy

To move or copy tests or folders in a project,

  1.  Highlight the intended test or folder
  2.  Select the Move/Copy button in the toolbar
  3.  Choose the Move or Copy radio button according to which function you want to use
  4.  Find and select the new destination in the folder tree
  5.  Select either Move or Copy at the bottom of the window
Move/Copy Note
The destination folder must be different than the current folder when moving items.

Access

1. On the navigation pane in the appropriate project, click Tests.


Was this article helpful?

What's Next